Aparthotel in Antalya

aparthotel

Breaking the Deadlock

Reconstruction and repurposing of a multi-apartment residential complex into an apart-hotel in Antalya.

“Developing a project strategy helped break the deadlock that had been holding the project back.”

Features of Project

Building redevelopment, interior design development in accordance with the agreed budgets. Included: plumbing, heating, ventilation, and sauna. Custom design of a restaurant, massage room, heated pool, bar, and cafe for breakfast and quick lunches. Design of low-current systems such as video surveillance, security, and fire alarms.

Demolition work down to the main load-bearing frame of the building. Conducting a concrete strength assessment of the frame.

After the assessment:
- Reinforcement of reinforced concrete structures with carbon fiber;
- Filling internal and external partition walls with brick;
- Installation of underfloor heating;
- Installation of metal roof structures;
- Installation of cable ducts;
- pouring a cement-sand screed;
- pouring concrete for the pool;
- installing ceramic floor tiles;
- façade work;
- electrical system installation and finishing.

Design
Construction Permits & Approvals
Construction Phases
reconstruction-before

From the initial concept, design, and renovation to the final handover.

Working Process

01
Step

Obtaining permits

Change of use and other permits
02
Step

Design

Facade and interior designs
03
Step

Demolition work

Demolition of concrete/brick walls and ceilings, relocating openings, diamond cutting.
04
Step

Installation work

From reinforcing the frame and supply systems to installing interior systems according to the design.

Progress at a glance

      

Project Information

Category

Aparthotel

Start Time

June, 2024

End Time

December, 2025

Location

Antalya, Konyaaltı, Gürsu Mah., 322 Sok.